Switching system for clean water pumps

Client:Dunea
Project:Switching system for clean water pumps

Clean drinking water, 24 hours a day, 7 days a week; that is what Dunea supplies. However, in order to meet this demand both now and in the future, changes had to be made to the production capacity. Consequently, the production site in Scheveningen saw the realisation of two new clean water pump stations, with eight new clean water pumps and emergency generators, as well as four connections to the current pipe network (also known under the project name 2PGS). TPS supplied the electricians who carried out the connection work on the various electrical systems, such as low-voltage switchboards and emergency generators.